Micrylix | Trust System
Quality Assurance for Precision Plastic Machining
A structured quality workflow for custom PMMA, PEEK, PAI / Torlon and engineering plastic CNC machined components.

Quality
Quality Workflow
Quality starts before machining. Drawings, material requirements and inspection expectations are reviewed before production decisions are made.
Drawing Review
Critical dimensions, tolerances, threads, finishes and application notes are checked.
Material Verification
Material grade, supplied requirements and order information are confirmed before machining.
Machining
CNC process planning considers plastic behavior, workholding, burr control and surface requirements.
Inspection
Key dimensions, visible requirements and critical features are inspected before packing.
Packaging
Parts are protected to reduce scratches, edge damage and handling risk.
Shipment
Packed parts are prepared for international B2B delivery according to order requirements.
Inspection
Inspection Capability
Inspection scope is matched to drawing requirements, project risk and customer needs.
Tolerance Capability
Tolerance feasibility is reviewed according to material, geometry, size and critical feature requirements.
Critical Dimensions
Marked dimensions and functional interfaces can be prioritized during inspection.
Visual Inspection
Visible surfaces, edges, burrs, transparency and handling marks can be checked before shipment.
Material Verification
Material grade and customer notes are checked against order information.
100% Inspection Available
For selected projects, 100% inspection can be discussed during RFQ review.
Drawing-Based Criteria
Inspection planning follows customer drawings rather than generic catalog assumptions.
Documentation
Documentation
Documentation options should be requested during RFQ so they can be planned before production.
Quality
Quality FAQ
Can Micrylix provide inspection reports?
Inspection reports or dimensional reports can be discussed during RFQ. Requirements should be included with the drawing package.
Can you inspect critical dimensions?
Yes. Critical dimensions should be clearly marked on the drawing so inspection priorities can be reviewed before quotation.
Is 100% inspection available?
100% inspection can be discussed for selected projects depending on quantity, geometry and inspection scope.
Can you provide material certificates?
Material certificate requirements should be stated during RFQ so availability can be confirmed before production.
Can you support NDA projects?
Yes. NDA support can be reviewed before sharing confidential drawings or application details.
Send drawings for review
Upload drawings, material requirements, tolerance notes and quantity details. Micrylix will review manufacturability and respond with the next quotation step.
